At Megadrill Nigeria Limited, we are proud to be at the forefront of delivering complex and critical infrastructure projects that drive the energy sector forward. Here are some of our key ongoing projects, highlighting our commitment to excellence and innovation.

1.   Ministry of Works - Construction of Access Roads & Drainages at Bolon Road, Nasarawa LGA, Kano State.

  • Project Description: Megadrill undertook the construction of access roads and drainages at Bolon Road in Nasarawa Local Government Area, Kano State, in collaboration with the Ministry of Works.
  • Project Summary: The project aimed to improve transportation infrastructure and alleviate flooding in the area.
  • Work Scope: Our scope of work included earthworks, road construction, and drainage installation to enhance connectivity and mitigate the impact of heavy rainfall.

2.   NNPC/NGC - Erosion Control Works to Protect Exposed NGC Pipelines Between KP31+000 & KP32+715 in Ogun State

  • Project Description: Megadrill executed erosion control works to protect exposed NGC pipelines between KP31+000 and KP32+715 in Ogun State, under contract with NNPC/NGC.
  • Project Summary: The project aimed to prevent soil erosion and safeguard the integrity of the pipeline network.
  • Work Scope: Our work scope included the installation of erosion control measures, such as gabion baskets and riprap, to stabilize the terrain and protect the pipelines from environmental degradation.

3.   NNPC/Zakhen - Construction of 25km 36 Inch Excavus Lagos Pipeline

  • Project Description: Megadrill was responsible for the construction of a 25km, 36-inch Excavus pipeline in Lagos State, in collaboration with NNPC/Zakhen.
  • Project Summary: The project aimed to enhance the transportation infrastructure for oil and gas products in the region.
  • Work Scope: Our scope of work included pipeline laying, welding, testing, and commissioning to ensure the safe and efficient transportation of hydrocarbons.

4.   NDDC - Construction of Orie Akwa – Afor Akatta Road, Oru LGA, Imo State

  • Project Description: Megadrill completed the construction of the Orie Akwa – Afor Akatta Road in Oru Local Government Area, Imo State, under contract with the Niger Delta Development Commission (NDDC).
  • Project Summary: The project aimed to improve connectivity and accessibility in the local community.
  • Work Scope: Our work scope included road grading, paving, and drainage construction to enhance transportation infrastructure and facilitate economic development.

5.   NDDC - Construction of Solar-Powered Water Project at Iheagwa, Owerri West LGA, Imo State

  • Project Description: Megadrill installed a solar-powered water project in Iheagwa, Owerri West Local Government Area, Imo State, in collaboration with the Niger Delta Development Commission (NDDC).
  • Project Summary: The project aimed to provide sustainable access to clean water for the residents of the community.
  • Work Scope: Our scope of work included the installation of solar panels, water pumps, and distribution networks to ensure reliable water supply for domestic and agricultural use.

6.   NDDC - Contract for Solar Water Scheme in Line with Vision 2020 (Lot 14) at Kalaibiama in Opobo/Nkoro LGA, Rivers State

  • Project Description: Megadrill executed a solar water scheme project in Kalaibiama, Opobo/Nkoro Local Government Area, Rivers State, as part of the Vision 2020 initiative, under contract with the Niger Delta Development Commission (NDDC).
  • Project Summary: The project aimed to improve access to clean water and promote sustainable development in line with Vision 2020 objectives.
  • Work Scope: Our work scope included the design, installation, and commissioning of solar-powered water supply systems to address the water needs of the local community.

7.   NAOC - Rehabilitation and Asphalting of New Base Access Road and Mess Area

  • Project Description: Megadrill rehabilitated and asphalted access roads and mess areas for the Nigerian Agip Oil Company (NAOC).
  • Project Summary: The project aimed to enhance infrastructure facilities for NAOC’s operations.
  • Work Scope: Our work scope included road rehabilitation, asphalt paving, and landscaping to improve accessibility and safety within the base premises.

8.   NAOC - Completion of Alex Okoro Street, Omoku, River State

  • Project Description: Megadrill successfully completed the construction of Alex Okoro Street in Omoku, River State, as part of infrastructure development projects for the Nigerian Agip Oil Company (NAOC).
  • Project Summary: The project involved the finalization of Alex Okoro Street, contributing to improved accessibility and infrastructure in the Omoku area.
  • Work Scope: Megadrill executed the completion works, including road surfacing, drainage installation, and landscaping, ensuring the street’s functionality and aesthetics.

9.   NAOC - Construction of Car Park in Block A, C, D & E at Ebocha New Base Residential Area

  • Project Description: Megadrill undertook the construction of car parks in multiple blocks at the Ebocha New Base Residential Area, commissioned by the Nigerian Agip Oil Company (NAOC).
  • Project Summary: The project aimed to provide essential parking facilities for residents and employees in the Ebocha New Base Residential Area, enhancing convenience and organization.
  • Work Scope: Megadrill managed the entire construction process, including site preparation, layout design, and paving, ensuring efficient utilization of space and compliance with safety standards.

10.   Private - Construction of Three Duplexes in G.R.A Port Harcourt

  • Project Description: Megadrill completed the construction of three duplexes located in the Government Reserved Area (G.R.A) of Port Harcourt, as part of a private residential development project.
  • Project Summary: The project involved the construction of high-quality residential units to meet the housing needs of the local community, providing modern living spaces in a prestigious area.
  • Work Scope: Megadrill managed the construction from foundation to finishing, ensuring architectural integrity, structural stability, and adherence to client specifications.

11.   NAOC - Minor Concrete Surfacing Works on Mgbede 21 Location for NRG 101 Work Over Rig Activity (25m x 25m)

  • Project Description: Megadrill completed minor concrete surfacing works on the Mgbede 21 location to facilitate the NRG 101 work over rig activity.
  • Project Summary: The project involved the construction of a 25m x 25m concrete surface to support rig operations in Mgbede 21 location.
  • Work Scope: Megadrill executed the concrete surfacing works, ensuring a stable and durable surface for rig activity.

12.   NAOC - Preparation of IDU 9 Location for Rig Activity Concrete Works, Drainage & Waste Pits

  • Project Description: Megadrill prepared the IDU 9 location for rig activity, including concrete works, drainage, and waste pit construction.
  • Project Summary: The project aimed to create a suitable environment for rig operations at the IDU 9 location, ensuring infrastructure readiness.
  • Work Scope: Megadrill conducted concrete works, drainage installation, and waste pit construction, optimizing the site for rig activity.

13.   NAOC - NAOC - Construction of Mgbede 6 Location for Work Over Rig Activity

  • Project Description: Megadrill constructed the Mgbede 6 location to support work over rig activity for NAOC.
  • Project Summary: The project involved the construction of infrastructure necessary for rig operations at the Mgbede 6 location.
  • Work Scope: Megadrill executed the construction works, including site preparation and installation of necessary facilities for rig activity.

14.   NAOC - Rehabilitation of Ebegoro Location for Work Over Rig Activity

  • Project Description: Megadrill rehabilitated the Ebegoro location to facilitate work over rig activity for NAOC.
  • Project Summary: The project aimed to restore and upgrade infrastructure at the Ebegoro location to support rig operations effectively.
  • Work Scope: Megadrill conducted rehabilitation works, including repairs and upgrades, to enhance the operational efficiency of the Ebegoro location.

15.   NAOC - Rehabilitation of IDU 7 Location Access Road Section B

  • Project Description: Megadrill rehabilitated Section B of the access road at IDU 7 location for NAOC.
  • Project Summary: The project focused on improving accessibility and safety by rehabilitating a section of the access road at IDU 7 location.
  • Work Scope: Megadrill conducted road rehabilitation works, including resurfacing and repairs, to enhance transportation infrastructure.

16.   NAOC - Reconstruction of IDU Main Road Section A, B, C

  • Project Description: Megadrill reconstructed Sections A, B, and C of the main road at IDU location for NAOC.
  • Project Summary: The project involved the reconstruction of key sections of the main road to ensure smooth transportation within the IDU area.
  • Work Scope: Megadrill executed road reconstruction works, including earthworks and pavement construction, to improve road conditions

17.   NAOC - Construction of Access Road to Akri 5 and 9 Locations and Access Road to Flow Station

  • Project Description: Megadrill constructed access roads to Akri 5 and 9 locations and a flow station for NAOC.
  • Project Summary: The project aimed to improve accessibility to remote locations and facilities, facilitating operational efficiency.
  • Work Scope: Megadrill executed road construction works, including grading and surfacing, to create access routes to designated locations.

18.   NAOC - Flow Line Laying Replacement and Repair in the Land Area

  • Project Description: Megadrill replaced and repaired flow lines in the land area for NAOC.
  • Project Summary: The project involved the replacement and repair of deteriorated flow lines to ensure the integrity and reliability of the pipeline network.
  • Work Scope: Megadrill conducted flow line replacement and repair works, including excavation and installation, to address integrity issues.

19.   NAOC - Perimeter Fencing and Provision of Solar Street Lights in Ebocha Pipe Rack Area

  • Project Description: Megadrill installed perimeter fencing and solar street lights in the Ebocha pipe rack area for NAOC.
  • Project Summary: The project aimed to enhance security and safety by installing perimeter fencing and lighting infrastructure.
  • Work Scope: Megadrill executed the installation of perimeter fencing and solar street lights, ensuring enhanced security and visibility in the Ebocha pipe rack area.

20.   SPDC - NAM WH Delivery Service

  • Project Description: Megadrill provided NAM WH delivery service for SPDC.
  • Project Summary: The project involved the timely and efficient delivery of materials and equipment to designated locations as per SPDC requirements.
  • Work Scope: Megadrill managed the logistics and delivery process, ensuring the safe and timely transportation of materials to NAM WH sites.

21.   SPDC - Supply of 10K Wellhead System for Assa North Appr

  • Project Description: Megadrill supplied a 10K wellhead system for the Assa North Appraisal project, commissioned by the Shell Petroleum Development Company (SPDC).
  • Project Summary: The project aimed to enhance the oil and gas production capabilities of the Assa North field through the installation of a robust wellhead system.
  • Work Scope: Megadrill provided the wellhead system, including all necessary components and equipment, ensuring compatibility, reliability, and compliance with industry standards.

22.   NAOC - Minor Repair Work on Ebeboro 13 for Hana 120 Work Over Rig Activity

  • Project Description: Megadrill executed minor repair works on the Ebeboro 13 well for the Hana 120 workover rig activity, as part of ongoing maintenance operations for the Nigerian Agip Oil Company (NAOC).
  • Project Summary: The project involved addressing specific issues and optimizing the performance of the Ebeboro 13 well to support ongoing production activities.
  • Work Scope: Megadrill conducted diagnostic assessments, implemented necessary repairs, and conducted testing to ensure the well’s operational integrity and efficiency.

23.   Nigerian Gas Company Limited - Erosion Control Works on Emuren – Itoki Pipeline Right Of Way Between KP31+000 To KP32+750 Near Ogun River

  • Project Description: Erosion control works were conducted on the Emuren – Itoki pipeline right of way near Ogun River to secure the pipeline’s integrity. 
  • Project Summary: The project addressed erosion issues from KP31+000 to KP32+750, ensuring the pipeline’s stability and operational safety.
  • Work Scope: Assessment and Planning: Evaluated erosion and devised control measures. Excavation and Earthworks: Reshaped areas to improve drainage. Installation of Erosion Control Structures: Built retaining walls, gabions, and riprap. Rehabilitation of the Right of Way: Regraded soil and planted vegetation. Monitoring and Maintenance: Implemented regular inspections and maintenance.

24. NNPC/NGC/Zakhem - Construction of Escravos-Lagos 36” Pipeline ELP 2 (2013-2015)

  • Project Description: MEGADRILL was tasked with the construction of the 36-inch Escravos-Lagos Pipeline (ELP 2) as part of a critical infrastructure project for NNPC/NGC in collaboration with Zakhem Engineering. This pipeline is a vital component of Nigeria’s gas transportation network.
  • Project Summary: The project spanned from 2013 to 2015 and involved the construction of a major gas pipeline to enhance the distribution of natural gas from the Escravos region to Lagos, significantly boosting energy supply and economic development.
  • Work Scope: MEGADRILL’s role included pipeline laying, trenching, welding, and testing, as well as environmental protection measures. The project was completed with a focus on safety, efficiency, and adherence to the highest engineering standards.

Connect with us​

Connect with us

Reach out for more information or to discuss your project needs.

We’re here to help.

Reach out for more information or to discuss your project needs. We’re here to help.

Scroll to Top
×